After a pleasant stay in Hungerford, we finally got on our way again. Passing through Hungerford Marsh lock, which was another first for us, as it had a swing bridge over the lock chamber. We did plan on mooring at Great Bedwyn, but difficulties still continue as moorings were all full and nowhere else in between before the next place along, being Crofton. Unfortunately it meant another 4 locks, which were additional to the previous 10 that day. Good moorings though opposite the pumping station, which we will have to visit on the way back. From Crofton we then climbed to the summit of the canal, through Bruce tunnel, all locks from here are now down hill. Moored at Pewsey after completing 10 locks today.
Cobblers Lock
Part of the offending tree which caused the hold ups
Reaching the summit, 450 ft above sea level
Approaching Bruce tunnel, 502 yds long
Inside Bruce tunnel
1 comment:
great photo in the tunnel
Post a Comment